DOTr expects to install new MRT-3 rails starting November

Robie de Guzman
Courtesy: DOTr MRT-3 Facebook page

MANILA, Philippines – More than 4,000 pieces of brand new rails for the Metro Rail Transit line 3 (MRT-3) have been delivered to the Philippines, the Department of Transportation (DOTr) said on Wednesday.

In a Facebook post, the DOTr said the rails, each measuring 18 meters long, have arrived on Tuesday at the Port of Manila from Japan. The delivery was made months ahead of the expected delivery date, the agency added.

TALAGANG GOOD ANG MORNING!DUMATING NA sa Pilipinas ang buong shipment ng mga BAGONG RILES para sa MRT-3! Dumaong ang…

Posted by Department of Transportation – Philippines on  Tuesday, 9 July 2019

From the Port of Manila, the Japan-made rails were transported to the Tracks Laydown Yard near the Parañaque Integrated Terminal Exchange (PITX).

The DOTr said its installation onto the MRT-3 mainline is scheduled to begin in November if the rest of tracks are delivered in October as expected.

To avoid disruption in the line’s daily train service, the agency said, rail replacement works will only take place during non-operating hours.

The DOTr expects the new rails to reduce excess vibration of trains which cause damage to its electrical and mechanical component, and later leads to glitches or train breakdown.

The procurement of new rails is part of the ongoing comprehensive rehabilitation of the MRT-3 to bring back the railway’s high-grade design condition, according to the DOTr.

The post DOTr expects to install new MRT-3 rails starting November appeared first on UNTV News.