2 / 21

A passenger checks-in his luggage using an automated booth at the newly opened Changi International Airport’s Terminal 4 in Singapore

A passenger checks-in his luggage using an automated booth at the newly opened Changi International Airport’s Terminal 4 in Singapore (AFP Photo/ROSLAN RAHMAN)

PHOTOS: Changi Airport Terminal 4 officially opens

Changi Airport’s Terminal 4 officially opened on Tuesday (31 October). Its first flight from Hong Kong, Cathay Pacific Airways CS659, touched down at 5:25am. The new terminal was built at a cost of S$985 million (US$723 million). FULL STORY